Monday, February 2, 2015

Work due for February 9th

According to your Production Calendars as of 02feb15:

Tim
• sh01, sh02 animated. did: new voice recording posted on blog. need to get shot list/production calendar working.

Mee
• sh01, 02, 05,06, 07 animated. did: worked on animatic ending. update shot list/production calendar.

Chris
• sh03, 04, 05, 06 animated. did: 15 seconds(?); make shot list/production calendar functional.

Meghan
• BG's 01,02,03,04,10,11,12,13 done. S01,02,06 animated. did: BG01, 02, 11, 13; S01, 02, 06. update shot list/production calendar.

James
• animatic completed. did: animatic done
• 6 shots animated and cleaned up (which ones?). did: keys for shot 01 drawn, need to be loaded

Cynthia
• 19 backgrounds completed (which ones?). did: 12 BG done.

Andrew
• bg 01-05 done. did: did rough layouts for BG01, 02

Andre
• sh03 animated. did: BG03 done; Sh03 keys done

Ra'shon
• blog/calendar not posted: 24 seconds animated.

Greg
• calendar not posted: 24 seconds animated. did: 14 seconds *see 7 seconds on blog

Marc
• production calendar incomplete: 24 seconds animated. did: sh01, 02; not posted to blog