Sunday, April 5, 2015

06 apr 15 - week 11

Progress as per Blog Production Calendars:

Tim:
• sh01, 02, 03, 04, 05, 06, 07, 08, 09, 11 cleaned

calendar revised to: Revise completed shots, fix backgrounds, work on title card
notes: What revisions did you make to the shots and backgrounds? Post title card.

Mee:
• sh 17, 18, 19 keyed *from last week
• sh 20, 21, 23 animated
*19 animated, 20 keyed
notes: concerned about overall progress. At this point, we should be halfway through cleanup: Try creating rough drawings without construction lines that can be used as final drawings. Focus on keys rather than in-betweens.

Chris:
• *nothing indicated on Production Calendar

Meghan:
• In-betweened &Colored): S03, S04, S05, S12, S13, S14, S15
notes: Good progress. Experiment with pin tool animation of flowers; consider POV when using blur effect.

James:
• sh14,sh15,sh16,sh18, Animated(shots 14 & 15 were finished, was not able to get to 16 and 18) *from last week
• sh19,sh20,sh21 Animated
• sh1,sh2,sh3,sh4,sh5, Cleaned & Colored, Composited

* sh1,sh09,sh08,sh07, Cleaned & Colored, Composited

notes: Production Calendar revised.


Cynthia:
catch up week
• Finish animating keyed shots 22-24
• finish last shots
• color


notes: Good progress. Finish animating remaining shots. Throw finished shots into animatic to get a sense of overall pacing - feels like it needs some tightening.

Andrew:
sh01, 23, 08, 09 animated


notes: one traceback without the tracebacks, one still image, one eyelid opening; too little, too late: Need to make significantly more weekly progress in order to finish this piece successfully.

Dre:
• Animated shots 13, 14
• next week?

Animated shots 5,7,16,19 Background 16


notes: finish unfinished (yellow) shots and then move on to compositing.

Ra'shon:
• *nothing indicated on Production Calendar
• Rough of first 30 seconds/keys of 8-15 (keys done for sh08-15)

notes: More than last week, which is good, but there is still a lot of catching up to do. Draw keys as final drawings (i.e. no construction lines). Focus on composition and storytelling points: what's the character's project? Why is she worried about time? Does she have only a few hours to finish the project? or is this a matter of days/weeks, as her calendar would seem to imply?

Greg:
• Tower April6-13 (*50% this week)

notes: update calendar, add finished shots to animatic

Marc:
• Shots 13, 14, 19, 22

notes: good progress.