Tim
Production Calendar says:
animated:
sh07
sh15
sh14
sh16
sh05 animated (from last week)
• Does the Production Calendar include all of your shots?
• Total number of days of animation (easy, medium, difficult) still needs to be added up. How many backgrounds, total?
• Need printable production still based on Annecy specs
Notes: one shot, unidentified, posted to blog, 1 second duration.
Mee
Production Calendar says:
animated:
sh09
sh10
sh11
sh14
sh15
•
• Questions: re-size multiple images in Toon Boom; coloring in Toon Boom
• Need printable production still based on Annecy specs
Notes: no work posted.
Production Calendar says:
animated:
sh14
sh15
sh16
sh17
sh18
• What's the difference between the red and the strike-throughs on your production calendar? It's not clear. Please fix.
• Add description to influences: how do they inform your piece?
• Synopsis is minimal and contains an obvious grammatical error. please fix.
• Influences are just links: add description of how they impact your piece, and make the links into clickable words instead of URLs.
• Correct spelling of the word "Production Still": attention to detail makes you look good. Inattention to detail makes you look the opposite.
• Make production calendar page link go to another tab rather than replacing your blog.
• Shot list: mark shots as "easy," "medium," or "difficult," and tally up the number of days it will take to animate them.
• If you have revised your animatic so that there are fewer shots, this should be reflected in your shot list/production calendar
• Add dates to the production calendar all the way to the end.
• Need printable production still based on Annecy specs
Notes: 60 seconds of rough animation posted. Good progress with animation this week, but cannot tell what shots are what until shot list and production calendar are updated. See notes, above and make sure to make revisions.
Production Calendar says:
animated:
Notes: Done. Make note of which shots have been posted and update Shot List. Good progress.
James
Production Calendar says:
3 Shots rough animated *Please indicate which shots in the Production Calendar. (
• Need printable production still based on Annecy specs
• Put finished shots together to start building a new animatic
Notes: Shot "Chair get up" posted (sh04?).
Cynthia
Production Calendar says:
sh12
sh13
sh14
sh15
• Embed video into blog post rather than just using the link to make it one step for the viewer to see
• ps - I like your "Apple" animation from Object Animation class: nice acting, rich color and lighting
Notes: Production Calendar says sh05, 06, 07, 08, 09, 10, 11, animated, sh12, 13, 14, 15 in progress. Please note which shots are done on post.
Andrew
Production Calendar says:
sh08 animated
• Synchronize production calendar and shot list.
• Key animation posted for sh06; sh05 zoom
• Add dates for final backgrounds in Shot List & Production Calendar
• add festival program-style synopsis to "About" page
Notes: bg03, 04, 05 posted. Keys for sh05, 06, 07 posted.
Andre
Production Calendar says:
shot07 bg
shot08 bg
Shot List says:
sh07 animated
• Fill in missing dates in your Production Calendar
Notes: no worked posted to blog.
Ra'shon
60 seconds animated (no shot list or production calendar on blog)
• Production Calendar & Shot List?
• Rework story beginning and end so they reflect the cliché upon which the story is based.
• Rapidly passing the point of no return, here. See me in class.
Notes: no work posted to blog.
Greg
Production Calendar says:
audio editing/timing finalized.
• Add seconds to each sequence defined in Production Calendar (e.g. "Commercial, 24 sec.")
• Embed movie into "animatic" page.
• Need printable production still based on Annecy specs
Notes: no work posted to blog.
Production Calendar says:
60 seconds animated & colored.
• Revise Shot List dates so they reflect a regular working pattern.
• Synch Production Calendar to revised Shot List.
Notes: roughly